BEFORE AND AFTER
HEAT EXCHANGER
Treatment of cooling water
The Merus ring is crucial for enhancing heat exchanger efficiency and system longevity.
Results can be monitored after 6 months, allowing for timely assessments of the cooling system.


BEFORE
6 months later
Sea water scaling in fresh water generator
Installation of a Merus ring at the fresh water generator which is used to produce drinking water out of sea water
Without Merus scale and corrosion, despite the use of chemicals (pic 1)
After 7 months with Merus clean, without chemicals or mechanical cleaning (pic 2)


BEFORE
7 months later
1
2
Effluent System
Blocking an effluent pipe can cause operational challenges. It's essential to maintain clear passage to prevent costly repairs or environmental issues.


BEFORE
10 months later
Installation of Merus ring for a 12-month demo
After treatment with Merus rings:
Pipe diameter near normal, indicating restored flow efficiency.
Service contract ensures ongoing success; regular maintenance is essential.




Before
Strong buildup of limescale
Rust stains around nozzles and metal surface
Clogged water outlets
After 4 Months
Limescale minimalized
Rust stains removed
Free water outlets
Bathroom - jotel Limescale
Water Distribution


Before Merus:
High TDS in well water caused fouling of membranes.
Pre-filters needed replacement every week.
RO membranes replaced every 3-4 months.
Chemicals were added to slow fouling, but capacity still declined
After Installing Merus:
Fouling was eliminated, membranes stayed clean.
No chemicals required for operation.
Pre-filters lasted much longer.
Membranes needed replacement only once per year.
Stable production with no downtime.
Significant cost and energy savings (pumps operated at lower power).
Investment paid back within 2 months.




Desalination Plant
Installation






Sustainability
Innovative eco-friendly water treatment solutions.
Contact
+34 666 691 585
+351 912 736 920
© 1996. All rights reserved.
